Skip to book a demo
Offshore survey operations

The offshore survey operations command center.

SurveyIQ turns scopes of work into procedure packs, work packages, live logbooks, findings, DPRs, and deliverables — all connected in one project command center.

Built for offshore survey campaignsProcedure-first executionDPR-ready operationsHuman-reviewed AI workflows
SurveyIQ command center
Scope of WorkProceduresWork PackagesLogbookDPRDeliverables
AI-assistedHuman-reviewedSource-referencedProject-scopedDPR-ready

See SurveyIQ in 90 seconds

Short walkthroughs for survey managers, offshore leads, and client representatives — from command center to procedure packs and daily reporting.

See SurveyIQ in 90 seconds

See SurveyIQ in 90 seconds

Short walkthroughs for survey managers, offshore leads, and client representatives — from command center to procedure packs and daily reporting.

Command Center walkthrough

Survey managers and project leads

Live project status, department cards, stop-work awareness, and today's plan from work packages.

Procedure Pack workflow

Engineering and survey planning teams

Upload a scope of work, identify missing inputs, generate draft procedures, and route for human review before execution.

Logbook and DPR workflow

Offshore party chiefs and report authors

Department logbooks, quick-entry keypads, findings register, and DPR source notes built from recorded project facts.

Offshore survey operations are still held together by documents, spreadsheets, and memory.

Procedures written late

Scope arrives, procedures are still being built manually.

Logbook chaos

Daily operational truth is split across spreadsheets, emails, chats, and notebooks.

DPR pressure

Reports are assembled at the end of long shifts from incomplete evidence.

Poor traceability

Findings, evidence, logs, and deliverables are disconnected.

HSE & stop-work visibility

Risks and procedural blockers are not always visible across departments.

Project manager blind spots

Shore teams discover problems after the fact instead of during execution.

Scope → execution

From Scope of Work to execution-ready project control.

One connected thread — from the scope of work to issued daily reports.

Scope input

Upload or paste the scope.

Scope input

Offshore geophysical survey — MBES, SSS and 2DHR

Mobilisation window: Q3 2026

Deliverables: DPR, field report, GIS charts

Source document uploaded · 24 pages

Missing inputs

SurveyIQ identifies what still needs confirmation.

Vessel nomination

Awaiting confirmation

MBES model

Awaiting confirmation

Mob date

Awaiting confirmation

Procedure register

Draft procedures are generated for human review.

Procedure register

MBESDraft
2DHRReview
HSEApproved
DPRDraft

Approved work packages

Approved procedures become executable work packages.

PM-001

Executable work package

HSE-001

Executable work package

SUR-001

Executable work package

ACQ-001

Executable work package

Live command center

Offshore teams work from one operational truth.

Survey

Active

Acquisition

Active

HSE

Clear

Marine

Active

Today's Plan

4 work packages · 2 departments active

DPR / deliverables

Reports are built from recorded project facts.

DPR readiness

DraftReady
Daily Progress Report
Field photos
QC summary
Command Center

One screen for the offshore truth.

SurveyIQ gives survey managers, offshore leads, and client representatives a live operational view of the campaign: what is safe, what is blocked, what changed, and what needs attention.

  • Project-scoped command center
  • Department status cards
  • Stop-work and stale-data awareness
  • Today's plan from work packages
  • Logbook and findings rollups
  • DPR readiness tracking
  • Water column / ROV condition rail
SurveyIQ command center

Today's Plan

Generated from approved work packages

Department readiness

Five departments on one project truth

DPR readiness

Track reporting completeness

Stop-work awarenessROV dive blocked — PTW not yet approved. Marine and Survey remain nominal.

ROV — blocked: awaiting PTW approval before dive.

Today's Plan

  • SurveyACQ-001 — MBES survey lines 12–18
  • HSEHSE-001 — Daily toolbox and PTW check
  • MarineMAR-001 — DP station-keeping watch
Missing information: 7
DPR readiness72%

Illustrative — not live data

Procedure pack review

Missing Information

Know what still needs confirmation

Source References

Traceable to the scope of work

Approve → Work Packages

Route into human approval

Procedure-first

Generate human-reviewed procedure packs before mobilisation.

SurveyIQ does not pretend AI replaces responsible engineering review. It accelerates the first structured draft, identifies missing inputs, preserves source references, and routes procedures into human approval before execution.

  • AI-assisted first draft from scope of work
  • Missing information identification
  • Source-referenced procedure sections
  • Human review and approval routing
  • Approved procedures become work packages
  • Audit trail from scope to execution
Send us a Scope of Work — we'll show you the procedure pack.

Replace end-of-day reconstruction with real-time operational evidence.

SurveyIQ captures operational facts as they happen. Department-scoped logbook keypads make it fast to record events, downtime, findings, HSE observations, and DPR source notes.

  • Department logbooks
  • Quick-entry keypads
  • Work-package context
  • Evidence attachments
  • Findings register
  • DPR source notes
  • Audit trail
Department logbook

Quick-entry keypad

Log events as they happen

HSE card

PTW, toolbox, stop-work

DPR source note

Evidence-backed reporting

Build DPRs from operational truth, not end-of-day reconstruction.

Daily reports and final deliverables should be generated from verified project facts: procedures, work packages, logbook entries, findings, HSE events, survey progress, and evidence.

Daily Progress Reports
Field Reports
Final Report Volumes
Deliverable Register
GIS / chart outputs
Client review status
Evidence-backed reporting

Built for offshore roles

Survey Manager / Party Chief

Pain: Procedures, logs, QC and reports are disconnected.

  • Procedure packs
  • Work packages
  • Survey log
  • QC awareness
  • DPR readiness
  • Deliverables
See survey workflow

Project Manager

Pain: Project truth is hidden offshore until the daily report arrives.

  • Command Center
  • Progress status
  • Missing information
  • Deliverable readiness
  • Client reporting
See command center

ROV / Inspection Supervisor

Pain: Findings, evidence and dive events are fragmented.

  • ROV event log
  • Findings register
  • Evidence chain
  • Water column view
  • Work-package context
See logbook workflow

HSE / Marine

Pain: PTW, stop-work and operational conditions need cross-department visibility.

  • HSE cards
  • Condition states
  • Stop-work banner
  • Department readiness
  • Audit trail
See HSE workflow

Client Representative

Pain: Hard to know what has happened, what is outstanding, and what supports the report.

  • Read-only command center
  • DPR readiness
  • Deliverables
  • Source evidence
  • Project status
See command center
Synthetic example · Human review required · Not client data

See how SurveyIQ structures an offshore survey scope.

Generated from a synthetic offshore survey example. Demonstration only — not a final approved procedure.

Example draft procedure pack — for demonstration only — generated from a synthetic offshore survey scope. Not a final approved procedure.
Missing information3
  • Offshore survey vessel nominationblocking · Marine
  • MBES sensor configurationimportant · Survey
  • Client DPR templateadvisory · Reporting
Assumptions3
  • Vessel and sensor models to be confirmed before mobilisation.
  • Client reporting templates to be provided before final issue.
  • Secondary inspection support is out of scope for this geophysical example.
Procedures4
ACQ-001Survey

MBES survey lines

3 steps

  • Confirm line plan and QC tolerances
  • Run patch test and record calibration
  • Acquire lines and log QC snapshots
ACQ-002Acquisition

2DHR acquisition

2 steps

  • Confirm source/receiver setup
  • Acquire test line and review records
HSE-001HSE

Daily HSE and PTW checks

2 steps

  • Confirm toolbox and PTW status
  • Record stop-work triggers in logbook
REP-001Reporting

Daily progress reporting

2 steps

  • Roll up logbook and work-package facts
  • Draft DPR for party chief review
Work packages4
PM-001Project setupSUR-001MBES acquisitionHSE-001Daily HSE checksREP-001DPR preparation
Source references2
  • Campaign scopeOffshore geophysical survey with MBES, SSS and 2DHR methods.
  • DeliverablesDaily progress reports, field report, charts and GIS database.

Have a scope of work? Let SurveyIQ turn it into a procedure pack.

Ready to control your next offshore campaign?

Have a scope of work? Let SurveyIQ turn it into a procedure pack.