Skip to book a demo
Offshore survey operations

The offshore survey operations command center.

SurveyIQ turns scopes of work into procedure packs, work packages, live logbooks, findings, DPRs, and deliverables — all connected in one project command center.

Built for offshore survey campaignsProcedure-first executionDPR-ready operationsHuman-reviewed AI workflows
SurveyIQ command center
Scope of WorkProceduresWork PackagesLogbookDPRDeliverables
AI-assistedHuman-reviewedSource-referencedProject-scopedDPR-ready

See SurveyIQ in 90 seconds

Short walkthroughs for survey managers, offshore leads, and client representatives — from command center to procedure packs and daily reporting.

See SurveyIQ in 90 seconds

See SurveyIQ in 90 seconds

Short walkthroughs for survey managers, offshore leads, and client representatives — from command center to procedure packs and daily reporting.

Command Center walkthrough

Survey managers and project leads

Live project status, department cards, stop-work awareness, and today's plan from work packages.

Procedure Pack workflow

Engineering and survey planning teams

Upload a scope of work, identify missing inputs, generate draft procedures, and route for human review before execution.

Logbook and DPR workflow

Offshore party chiefs and report authors

Department logbooks, quick-entry keypads, findings register, and DPR source notes built from recorded project facts.

Offshore survey operations are still held together by documents, spreadsheets, and memory.

Procedures written late

Scope arrives, procedures are still being built manually.

Logbook chaos

Daily operational truth is split across spreadsheets, emails, chats, and notebooks.

DPR pressure

Reports are assembled at the end of long shifts from incomplete evidence.

Poor traceability

Findings, evidence, logs, and deliverables are disconnected.

HSE & stop-work visibility

Risks and procedural blockers are not always visible across departments.

Project manager blind spots

Shore teams discover problems after the fact instead of during execution.

Scope → execution

From Scope of Work to execution-ready project control.

One connected thread — from the scope of work to issued daily reports.

Scope of Work

Upload or paste the scope.

Scope of Work — ABD-006C

Well site survey — jacket inspection campaign

Mobilisation window: Q3 2026

Deliverables: DPR, field report, GIS charts

Source document uploaded · 24 pages

Missing Information

SurveyIQ identifies what still needs confirmation.

Vessel nomination

Awaiting confirmation

MBES model

Awaiting confirmation

Mob date

Awaiting confirmation

Procedure Pack

Draft procedures are generated for human review.

Procedure register

MBESDraft
2DHRReview
HSEApproved
DPRDraft

Work Packages

Approved procedures become executable work packages.

PM-001

Executable work package

HSE-001

Executable work package

SUR-001

Executable work package

ACQ-001

Executable work package

Command Center

Offshore teams work from one operational truth.

Survey

Active

ROV

Standby

HSE

Clear

Marine

Active

Today's Plan

4 work packages · 2 departments active

DPR / Deliverables

Reports are built from recorded project facts.

DPR readiness

DraftReady
Daily Progress Report
Field photos
QC summary
Command Center

One screen for the offshore truth.

SurveyIQ gives survey managers, offshore leads, and client representatives a live operational view of the campaign: what is safe, what is blocked, what changed, and what needs attention.

  • Project-scoped command center
  • Department status cards
  • Stop-work and stale-data awareness
  • Today's plan from work packages
  • Logbook and findings rollups
  • DPR readiness tracking
  • Water column / ROV condition rail
SurveyIQ command center

Today's Plan

Generated from approved work packages

Department readiness

Five departments on one project truth

DPR readiness

Track reporting completeness

Stop-work awarenessROV dive blocked — PTW not yet approved. Marine and Survey remain nominal.

ROV — blocked: awaiting PTW approval before dive.

Today's Plan

  • SurveyACQ-001 — MBES survey lines 12–18
  • HSEHSE-001 — Daily toolbox and PTW check
  • MarineMAR-001 — DP station-keeping watch
Missing information: 7
DPR readiness72%

Illustrative — not live data

Procedure pack review

Missing Information

Know what still needs confirmation

Source References

Traceable to the scope of work

Approve → Work Packages

Route into human approval

Procedure-first

Generate human-reviewed procedure packs before mobilisation.

SurveyIQ does not pretend AI replaces responsible engineering review. It accelerates the first structured draft, identifies missing inputs, preserves source references, and routes procedures into human approval before execution.

  • AI-assisted first draft from scope of work
  • Missing information identification
  • Source-referenced procedure sections
  • Human review and approval routing
  • Approved procedures become work packages
  • Audit trail from scope to execution
Send us a Scope of Work — we'll show you the procedure pack.

Replace end-of-day reconstruction with real-time operational evidence.

SurveyIQ captures operational facts as they happen. Department-scoped logbook keypads make it fast to record events, downtime, findings, HSE observations, and DPR source notes.

  • Department logbooks
  • Quick-entry keypads
  • Work-package context
  • Evidence attachments
  • Findings register
  • DPR source notes
  • Audit trail
Department logbook

Quick-entry keypad

Log events as they happen

HSE card

PTW, toolbox, stop-work

DPR source note

Evidence-backed reporting

Build DPRs from operational truth, not end-of-day reconstruction.

Daily reports and final deliverables should be generated from verified project facts: procedures, work packages, logbook entries, findings, HSE events, survey progress, and evidence.

Daily Progress Reports
Field Reports
Final Report Volumes
Deliverable Register
GIS / chart outputs
Client review status
Evidence-backed reporting

Built for offshore roles

Survey Manager / Party Chief

Pain: Procedures, logs, QC and reports are disconnected.

  • Procedure packs
  • Work packages
  • Survey log
  • QC awareness
  • DPR readiness
  • Deliverables
See survey workflow

Project Manager

Pain: Project truth is hidden offshore until the daily report arrives.

  • Command Center
  • Progress status
  • Missing information
  • Deliverable readiness
  • Client reporting
See command center

ROV / Inspection Supervisor

Pain: Findings, evidence and dive events are fragmented.

  • ROV event log
  • Findings register
  • Evidence chain
  • Water column view
  • Work-package context
See logbook workflow

HSE / Marine

Pain: PTW, stop-work and operational conditions need cross-department visibility.

  • HSE cards
  • Condition states
  • Stop-work banner
  • Department readiness
  • Audit trail
See HSE workflow

Client Representative

Pain: Hard to know what has happened, what is outstanding, and what supports the report.

  • Read-only command center
  • DPR readiness
  • Deliverables
  • Source evidence
  • Project status
See command center
Example draft procedure pack — for demonstration only

See what SurveyIQ generates from a well-site survey scope.

Generated from a representative well-site survey scope (ABD-006C style). Example draft for demonstration only — not a final approved procedure.

Example draft procedure pack — for demonstration only — generated from a representative well-site survey scope. Not a final approved procedure.
Missing information6
  • Vessel name not providedimportant · Marine
  • MBES model not providedimportant · Survey
  • SSS/SBP/MAG models not providedimportant · Survey
  • 2DHR source/streamer configuration missingblocking · Acquisition
  • Exhibit A1 / Exhibit H / GS-OT-GEO-201 missingblocking · Project
  • Client DPR form not uploadedimportant · Reporting
Assumptions2
  • Official SOW exhibits will replace this demo scope before client issue.
  • Sensor models, vessel name, mobilisation date and named personnel are intentionally not invented.
Procedures4
ACQ-002Survey

MBES Acquisition Procedure

3 steps

  • Verify MBES readiness
  • Acquire planned MBES line
  • Review QC and raise infill
ACQ-006Acquisition

2DHR Acquisition Procedure

3 steps

  • Confirm 2DHR line readiness
  • Execute soft start and line acquisition
  • Complete 2DHR QC handover
HSE-004HSE

HSE / MEDEVAC / ERP Procedure

3 steps

  • Verify ERP and MEDEVAC inputs
  • Run emergency briefing or drill
  • Track open HSE actions
REP-001Reporting

DPR / Reporting Procedure

3 steps

  • Compile DPR source data
  • Draft DPR with missing-input warning
  • Review and route DPR
Work packages29
PM-001Scope Review and Project SetupPM-002MDR and Submission ScheduleHSE-001HSE Plan and BridgingHSE-002ERP and MEDEVACMAR-001Vessel MobilisationMAR-002Deck Layout and Sea FasteningMAR-003Marine Spread AcceptanceSUR-001Geodetic SetupSUR-002Navigation CalibrationSUR-003USBL CalibrationSUR-004MBES Patch TestSUR-005SVP AcquisitionACQ-001Single-Pass Geophysical AcquisitionACQ-002MBES AcquisitionACQ-003SSS/SBP/MAG AcquisitionACQ-0042DHR AcquisitionENV-001MMO/PAM and Soft StartQC-001Onboard QC and Daily ReviewPROC-001MBES ProcessingPROC-002SSS ProcessingPROC-003SBP ProcessingPROC-0042DHR ProcessingREP-001DPR ProductionREP-002Field ReportREP-003Final Report Vol. 1REP-004Final Report Vol. 2REP-005Final Report Vol. 3REP-006GIS and Data DeliveryDEMOB-001Demobilisation and Closeout
Source references3
  • Project scopeABD-006C Well Site Survey for Absheron Eastern Development Project.
  • Survey methodsMBES, SSS, SBP, MAG and 2DHR methods are included.
  • Reporting and deliverablesDPRs, final report volumes, charts, GIS and data delivery required.

Have a scope of work? Let SurveyIQ turn it into a procedure pack.

Ready to control your next offshore campaign?

Have a scope of work? Let SurveyIQ turn it into a procedure pack.