Installation verification

Assess the as-installed asset against the design and project acceptance requirements.

As-installed deviation assessment.

Inputs to discuss
Design revision, asset datum and reference points, survey solution, reference systems and applicable acceptance criteria.
Review focus
Review transformations, offsets, calibration, uncertainty and position, elevation and orientation deviations.
Outputs to examine
Deviation assessment, supporting evidence, exceptions and engineering disposition.

Confirm supported methods, input formats and outputs during the technical evaluation.

Discuss this workflow

The verification basis

Design and acceptance basis

Identify the asset datum, surveyed reference points and design revision. Establish the required position, elevation and orientation, the applicable project tolerances and the agreed acceptance procedure.

Reference systems and transformations

Identify the horizontal CRS, vertical datum, units and survey epoch. Document the relationship between sensor, vessel, survey and asset frames, including offsets and orientation conventions.

Survey solution and uncertainty

Review observation provenance, calibration records, processing method and quality indicators. Assess whether the uncertainty of the reported asset reference is suitable for the verification requirement.

Deviation assessment and disposition

Report deviations for the specified asset reference against the relevant requirements. Preserve exceptions, unresolved conditions and supporting evidence for the responsible engineer’s acceptance decision.