Design and acceptance basis
Identify the asset datum, surveyed reference points and design revision. Establish the required position, elevation and orientation, the applicable project tolerances and the agreed acceptance procedure.
Assess the as-installed asset against the design and project acceptance requirements.
Confirm supported methods, input formats and outputs during the technical evaluation.
Discuss this workflowIdentify the asset datum, surveyed reference points and design revision. Establish the required position, elevation and orientation, the applicable project tolerances and the agreed acceptance procedure.
Identify the horizontal CRS, vertical datum, units and survey epoch. Document the relationship between sensor, vessel, survey and asset frames, including offsets and orientation conventions.
Review observation provenance, calibration records, processing method and quality indicators. Assess whether the uncertainty of the reported asset reference is suitable for the verification requirement.
Report deviations for the specified asset reference against the relevant requirements. Preserve exceptions, unresolved conditions and supporting evidence for the responsible engineer’s acceptance decision.