Abstract
Daily reporting combines recorded events, quantities, time periods and reviewed narrative. A useful reporting workflow makes it possible to inspect how a reported statement relates to the underlying project record.
Technical field. Reporting
Design considerations
- Entries need time context, attribution and a defined correction process.
- Computed metrics need a stated reporting period, units and treatment of incomplete or corrected entries.
- Generated or drafted narrative requires review. Verification needs to identify the specific fields and assertions that are actually checked.
Questions for technical evaluation
- Which event types and reporting metrics are supported?
- Can reported quantities be traced to their contributing entries and reporting period?
- How are unsupported statements, corrections and report revisions reviewed before issue?
Scope of this note
This note describes workflow design and evaluation considerations. Supported behaviour, interfaces, controls and limitations need to be demonstrated for the proposed product configuration and intended project.